[02] · WORK LAST 18 MONTHS

What we actually
built.

Anonymised selection with client permission. Concrete metrics — never „significant efficiency improvement". Full reports, with non-anonymised references, on the first call.

Industrial manufacturing facility
001 · INDUSTRY2025 · 14 WK.

Cloud migration of a manufacturing platform

DACH industrial group (3,200 employees): migrated the production-order platform from two on-prem data centres to AWS, with continuous live operation. New multi-account setup, IAM baseline, cutover in 7 waves with zero downtime.

−42%
Infra cost
0
Min downtime
14
Weeks
Automated logistics warehouse
002 · LOGISTICS2025 · 9 MO.

Internal developer platform for logistics operator

Series-D logistics operator: built an internal developer platform on Kubernetes with Backstage frontend, ArgoCD GitOps, and service templates. 9 squads, ~80 engineers now have self-service deploys.

11d→2h
Time-to-First-Deploy
+3.4×
Deploy frequency
9
Months
Financial dashboard
003 · FINTECH2024 · 6 MO.

Data lakehouse + ELT for Series-A fintech

Series-A fintech (45 employees): built a lakehouse architecture on Snowflake + Iceberg with dbt transformations and Airflow orchestration. Data contracts between service domains and analytics, full handover to in-house data team.

7→1
Source pipelines
15min
Reporting latency (was 24h)
6
Months
Engineering dashboards
004 · SAAS2024 · 4 WK.

Engineering audit + DevEx roadmap

SaaS scale-up (90 employees, ~35 engineers): four-week audit with DORA measurement, build-time analysis, and retrospective review. Output: 96-page assessment plus 12-month roadmap with effort estimates.

96
Pages of finding
23
Prioritised actions
4
Weeks

Detailed reports come on the call.

Once we know your sector and stage, we send the matching detailed case studies — with non-anonymised client references.

Request first call