Projects · Last 24 months

What we actually built.

A selection from the last two years. With metrics, with client names where permitted — no architectural renderings, no marketing photography. Full list on request.

Quartier West, MusterortQuarter
Musterort2025Süd-Wohnen GmbH

Quartier West

32 apartments, 5 storeys, timber-hybrid with RC stairwells. CLT slabs, prefabricated timber-frame external walls with ventilated larch facade.

3,840m² living
11wks assembly
−42%CO₂ vs. RC
Primary School Plus, HeilbronnEducation
Heilbronn2024City of Heilbronn

Primary School Plus

Extension of a municipal primary school, 6 new classrooms and canteen. Solid timber, untreated larch facade, exposed CLT slabs inside.

1,420m² floor
8months total
A+energy
Rooftop additionAddition
Musterort2023Private owner

Rooftop addition · Marktplatz

Two-storey timber addition on a three-storey existing city-centre building. 12 new apartments, work during ongoing rental operation of lower floors.

12units
6wks assembly
2storey add-on
Industrial hallIndustrial
Crailsheim2025Industrial client

Industrial hall South

Large-area logistics hall in glulam construction. 32m spans with glulam trusses, timber-frame external walls, sandwich roof elements.

4,200
32mspan
14wks total
Office HainOffice
Musterort2024Hain Real Estate AG

Office Hain

Timber-hybrid office building, 5 storeys. RC cores with stairs and lifts, timber slabs on steel sections for 14m spans, ventilated timber facade.

2,860m² office
5storeys
DGNBGold pre-cert
Timber facade detailIn planning
Munich2026Confidential developer

Wohnquartier 6Storey

Currently in structural engineering phase — quarter with three buildings, 6 storeys each, timber-hybrid. Construction starts summer 2026.

86units
3buildings
2027completion